TxDOT Tarrant County Highway SH 121

Project Details:

Location: Hamilton City, TX

Project Value: 5.7 M

General Contractor: DCI Contracting, Inc.

Overview:

Scope of Work includes reconstruction of bridge and channel (18,388 CY excavation, 287 CY embankment, 1,697 SY soil retention, 2,260 SF temporary spillway shoring, 4,802 LF soil nail anchors, drill shafts, retaining wall, bridge sidewalk, beams, rip rap and RC pipe).